This tilt-wall and precast structure houses a single tenant (Fortune 100 client) with 18 MW of critical load, totaling 188,617 SF. With a 7 1/2-month schedule, this ground-up project was completed on time from start to a fully commissioned data center with four months of around-the-clock construction.

This two-story building includes:

  • 16 – 2.25-MW generators
  • 48 – 750-kW UPSs
  • 96 – 600A STS/PDUs
  • 16 – 425-ton roof-mounted chillers
  • 48 – 6,000 CFM CRAC units

To reduce noise to an adjacent residential neighborhood and two separate utility yards, 30-foot-tall sound barrier walls were installed on the entire west side of the project site. These walls consisted of poured-in-place concrete, tilt panels and precast at various areas of the building to remain within the sound ordinance levels. 



Owner: CyrusOne

Project Highlights

  • TILT-WALL AND PRECAST STRUCTURE HOUSES FORTUNE 100 SINGLE TENANT
  • 30-FOOT-TALL SOUND BARRIER WALLS INSTALLED TO REDUCE NOISE TO ADJACENT NEIGHBORHOOD
Upper generator yard with UPS containers on the bottom and Generators with the mufflers on top

Upper generator yard with UPS containers on the bottom and Generators with the mufflers on top

High-security lobby entrance with owner-branded finishes